SUEZ RV DEEE operates a recycling plant for small domestic appliances engineered and commissioned by URT in Feyzin, France. The plant combines reliable depollution with multi-stage material separation, processing heterogeneous e-waste streams at 4 t/h. Implemented as a brownfield solution, it integrates into an existing facility including adaptation of equipment and control systems.

Key Facts:
  • Brownfield solution with integration into anexisting plant including adaptation of existing equipment and control system

Projektdaten

Kunde:
SUEZ RV DEEE
Anlagenkapazität:
4 t/h
Fertigstellung:

Project Data

Client:
SUEZ RV DEEE
Location:
Feyzin, France
Recycling Category:
IT, Small and Large Domestic Appliances
Applications:
Small domestic appliances and mixed e-waste streams
Plant Capacity:
4 t/h
Staff per shift:
approx. 10–12
Special engineering scope:
Brownfield solution with integration into an existing plant including adaptation of existing equipment and control system
Shredding technology:
Pre-shredding and secondary shredding
Separation technology:
Manual depollution, Fe/NF separation, downstream material fractioning
Compliance:
WEEELABEX

Project Description

SUEZ RV DEEE operates a recycling plant for small domestic appliances engineered and commissioned by URT. The facility is designed for the processing of heterogeneous e-waste streams under continuous industrial operating conditions.

The processing concept combines reliable depollution with multi-stage material separation. Prior to shredding, defined foreign materials such as screens, toner cartridges, smoke detectors and batteries are removed. Following pre-shredding, the material is processed through an additional manual sorting stage to extract critical components including batteries, capacitors, printed circuit boards and cables. The remaining material is further treated through secondary shredding and downstream separation, including ferrous and non-ferrous metal recovery and material fractioning.

The plant is integrated into an existing facility, including adaptation of existing equipment and integration of new components into the existing control and visualisation system.

Weitere Einblicke

No items found.

Project Gallery

SUEZ RV DEEE
SUEZ RV DEEE
SUEZ RV DEEE
No items found.

Similar Projects

No items found.

We will advise you on your individual request

Contact us for an initial consultation regarding your specific requirements.

Marco Fischer
Head of WEEE Engineering